The BOP handling system developed by L&H is mainly used in all kinds of offshore drilling platforms and drilling rigs,mainly consists of three parts, 125T hydraulic double beam crane, 35T electric double beam crane and 125T transfer vehicle.The system is able to complete the BOP by hatch area to the wellhead area transportation,lifting and so on, the maximum lifting load is 125t.
Classification | CCS/ABS |
---|---|
Ambient Temperature | -20°~50° |
Main Crane Capacity(SWT) | 125T |
Auxiliary Crane Capacity(SWT) | 2×17.5T |
BOP Haulage truck CAPACITY(SWT) | 125T |
Levels of protection | IP65 or above eIP65 |